Chapman Street Culvert, Town of Winterville

Ark Consulting Group led a comprehensive drainage infrastructure project for the Town of Winterville, beginning with our 2016 Nobel Canal Drainage Study that identified $6 million in critical storm drainage needs. Our analysis pinpointed the need to replace twin 60" CMP pipes with twin 6'x5' reinforced concrete box culverts at Chapman Street as a priority solution to address downtown flooding. We guided the Town through successful grant acquisition from the Golden Leaf Foundation's Disaster Recovery Act of 2016, securing project funding. Our team managed key aspects including survey coordination, easement mapping, construction documentation, permitting, and project administration through completion in 2019. This project demonstrates our expertise in hydraulic analysis, infrastructure design, and grant funding assistance, resulting in improved flood control for Winterville's business district.